This view shows the copper pipe through the mid section of the PVC tee.
Note the two 5/8 inch holes are precisely sized and drilled to snugly hold the 5/8 OD of 1/2 inch copper plumbing pipe.
Shown in the pencil mark from previous midpoint measurement to help center the pipe in this holder.


